Updates from the Etna Center for Community
Week of January 13-19, 2025

Above. ORM Contracting utilizing an excavator to remove the rear two-story debris.
On a frigid, wintery day (1.16.2025), snow flakes swirled around and the sounds of crunching wood, metal, and masonry made for a beautiful scene. With a plan in place for safe demolition of the rear structures, Odell Minniefield Jr. and his crew at ORM Contracting brought in their CAT 316F hydraulic excavator and accelerated the pace of structure and debris removal.
1. Rear two-story structures prior to excavator arrival. 2. Rear two-story structure demolition. 3. View from second floor, north, of rear structure demolition.
Future work anticipated:
Begin interior demolition of three-story building.
Continue exterior demolition of rear two-story buildings.